Project title | Degradation processes of mechanically loaded structures in hydrogen environment |
Project number | 2022/45/B/ST8/03494 |
Implementation period | 2023–2027 |
Project budget | 2,150,552.00 PLN |
Project title | Health assessment of composite structures based on multipoint, broadband excitation of guided waves and full wavefield analysis |
Project number | 2022/47/B/ST8/02963 |
Implementation period | 2023–2026 |
Project budget | 1,108,320.00 PLN |
Project title | Smart photon management in a photonic structure fabricated via laser irradiation |
Project number | 2021/41/B/ST8/01849 |
Implementation period | 2022–2026 |
Project budget | 1,816,600.00 PLN |
Project title | Health monitoring of ADditively manufactured structurES (HADES) |
Project number | 2019/35/B/ST8/00691 |
Implementation period | 2020–2025 |
Project budget | 1,987,200.00 PLN |
Project title | Study of elastic wave mode sensing and separation using FBG sensors for structural health monitoring |
Project number | 2020/39/B/ST8/01753 |
Implementation period | 2021–2025 |
Project budget | 1,566,400.00 PLN |
Project title | StUdy of fibre oPtic sEnsor aRrays for structuraL heAlth moniToring based on GuIded waVEs (SUPERLATIVE) |
Project number | 2019/33/B/ST8/01699 |
Implementation period | 2020–2024 |
Project budget | 1,584,400.00 PLN |
Project title | Solar Reduction of CO2 at Nano-Architectured Photoelectrodes Featuring Advanced Photon Management (SOLAFAME) |
Project number | 2020/39/I/ST5/01781 (OPUS LAP) |
Implementation period | 2022–2025 |
Project budget | 1,042,200.00 PLN |
Project title | Guided waves based reference-free structural health monitoring using fiber Bragg grating sensors (REF-FREE) |
Project number | 2020/39/D/ST8/00188 |
Implementation period | 2021–2024 |
Project budget | 1,195,980.00 PLN |
Project title | Analysis of phenomena occurring in hydrogen compressors operating in variable working conditions as a result of changes in the composition of the transport medium |
Project number | 2021/41/N/ST8/01867 |
Implementation period | 2022–2025 |
Project budget | 194,222.00 PLN |
Project title | Structure and photoelectrochemistry of the laser – graphitized polydopamine on TiO2 nanotubes |
Project number | 2022/45/N/ST5/00192 |
Implementation period | 2023–2024 |
Project budget | 69,620.00 PLN |
Project title | Aeroacoustic investigations of streamwise vortex generators for boundary layer separation control |
Project number | 2022/45/N/ST8/01425 |
Implementation period | 2023–2024 |
Project budget | 69,920.00 PLN |
Project title | Ordered mosaic of the bimetallic Au-Cu nanoparticles onto the conductive substrate - fabrication and properties |
Project number | 2019/35/N/ST5/02604 |
Implementation period | 2020–2024 |
Project budget | 209,520.00 PLN |
Project title | Application of radiographic methods in single particle pyrolysis studies |
Project number | 2020/37/N/ST8/03675 |
Implementation period | 2021–2024 |
Project budget | 117,600.00 PLN |
Project title | Thermal degradation processes of additive manufactured structures |
Project number | 2019/35/O/ST8/00757 (PRELUDIUM BIS) |
Implementation period | 2020–2024 |
Project budget | 458,400.00 PLN |
Project title | Fusion of Models and Data for Enriched Evaluation of Structural Health |
Project number | 2019/01/Y/ST8/00060 |
Implementation period | 2020–2024 |
Project budget | 904,620.00 PLN |
Programme | ALPHORN |
Project title | Additive manufactured composite smart structures with embedded fibre Bragg grating sensors (acronym: AMCSS) |
Project number | 2019/01/Y/ST8/00075 |
Implementation period | 2020–2024 |
Total budget | 1,133,080.00 PLN |
IMP PAN budget | 804,780.00 PLN |
Programme | M-ERA.NET 2 Call 2019 |
Project title | Semitransparent titania nanostructures on complex geometry surfaces for enhanced light harvesting and sensing |
Project number | 2020/02/Y/ST8/00030 |
Implementation period | 2021–2024 |
Total budget | 1,491,000.00 PLN |
IMP PAN budget | 839,880.00 PLN |
Programme | CEUS-UNISONO |